Complete delivery of steel structures for entrance gate
Complete delivery of steel structures.
Complete delivery of steel structures with assembly
Investor: Škoda electric a.s., Czech republic
Building: Steel structure
Place: Plzeň
Realization: 2017
Scope: Workshop documentation and "on key" delivery
http://a360.co/2u7MZrI - 3D model
Related items
- Complete delivery of steel pylon for KIKA ČB
- Complete delivery of steel halls for BERGER BOHEMIA on site Letkov
- Complete delivery of pipe racks for METROSTAV on site NEXEN Česká republika
- Structural design of pipe conveyor for final customer in France
- Complete delivery of steel construction for reinforcement ceiling
Image Gallery
- Pre-assembly on site Pre-assembly on site
- Prepare for final assembly Prepare for final assembly
- Detail Detail
- Final Final
- Assembly Assembly
View the embedded image gallery online at:
https://vhsc.cz/en/references/installation-of-steel-constructions/item/181-delivery-of-steel-structure#sigProGalleriaa884f82ac4
https://vhsc.cz/en/references/installation-of-steel-constructions/item/181-delivery-of-steel-structure#sigProGalleriaa884f82ac4