Complete delivery of steel pipe racks with detail design. Project have 400 tons of delivered steel.

Complete delivery of steel structures

Investor: Nexen Czech republic, Česká republika

Building: Steel structures

Site: Triangl Žatec

Realization time: 10/2017 - 04/2018

In project: DD, WD, Delivery, Assembly

https://autode.sk/2KQWubp

https://autode.sk/2KPYH76

Gallery

We are specialized in project documentation
and realization of industrial and civil buildings.

Copyright © 2024 VH Steel and Construction s.r.o. All rights reserved.

We are specialized in project documentation
and realization of industrial and civil buildings.

Copyright © 2024 VH Steel and Construction s.r.o. All rights reserved.

We are specialized in project documentation
and realization of industrial and civil buildings.

Copyright © 2024 VH Steel and Construction s.r.o. All rights reserved.