Complete delivery of steel construction for reinforcement ceiling
Structural design of steel structure according to EC, workshop documentation, fabrication and assembly of steel structure. Reinforcement was calculate from live load 500kg/m2 to 1000kg/m2.
Structural design, workshop documentation, delivery, assembly
Investor / Customer: RODESTOCK CR s.r.o.
Building: Reinforcement of ceiling
Place of build: Klatovy
Realization: 2016
Scope of contract: Structural design, workshop documentation, fabrication, assembly
Related items
- Complete delivery of steel pylon for KIKA ČB
- Complete delivery of steel halls for BERGER BOHEMIA on site Letkov
- Complete delivery of pipe racks for METROSTAV on site NEXEN Česká republika
- Pipe conveyor structural design for sand mine
- Structural design and workshop documentation of technological platforms for DOOSAN for project HOFOR BIO4
Image Gallery
- Assembly Assembly
- Location between technology Location between technology
- Assembly Assembly
- Prepared beams Prepared beams
- Final status Final status
View the embedded image gallery online at:
https://vhsc.cz/en/references/steel-constructions/item/154-structural-design?tmpl=component&print=1#sigProGalleriaaea5cc0e25
https://vhsc.cz/en/references/steel-constructions/item/154-structural-design?tmpl=component&print=1#sigProGalleriaaea5cc0e25