Logo
Print this page
Complete delivery of steel construction for reinforcement ceiling

Complete delivery of steel construction for reinforcement ceiling

Structural design of steel structure according to EC, workshop documentation, fabrication and assembly of steel structure. Reinforcement was calculate from live load 500kg/m2 to 1000kg/m2.

Structural design, workshop documentation, delivery, assembly

Investor / Customer: RODESTOCK CR s.r.o.

Building: Reinforcement of ceiling

Place of build: Klatovy

Realization: 2016

Scope of contract: Structural design, workshop documentation, fabrication, assembly

©2014 VH Steel and Construction s.r.o. Made by eifelstudio webdesign.