Complete delivery of pipe racks for METROSTAV on site NEXEN Česká republika
Featured
Complete delivery of steel pipe racks with detail design. Project have 400 tons of delivered steel.
Complete delivery of steel structures
Investor: Nexen Czech republic, Česká republika
Building: Steel structures
Site: Triangl Žatec
Realization time: 10/2017 - 04/2018
In project: DD, WD, Delivery, Assembly
https://autode.sk/2KQWubp
https://autode.sk/2KPYH76
Related items
Media
https://youtu.be/zM6WIZatzew
https://youtu.be/V2CgP7sr-ic
Image Gallery
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
View the embedded image gallery online at:
https://vhsc.cz/en/references/installation-of-steel-constructions/item/189-dodavka-ok?tmpl=component&print=1#sigProGalleria3c96191577
https://vhsc.cz/en/references/installation-of-steel-constructions/item/189-dodavka-ok?tmpl=component&print=1#sigProGalleria3c96191577
©2014 VH Steel and Construction s.r.o. Made by eifelstudio webdesign.