Complete delivery of steel pylon for KIKA ČB
Complete delivery of steel pylon. Project have 30 tons of delivered steel.
Complete delivery of steel structures
Investor: KIKA, Česká republika
Building: Steel structures
Site: ČEské Budějovice
Realization time: 09/2018
In project: Delivery, Assembly
Related items
- Complete delivery of steel halls for BERGER BOHEMIA on site Letkov
- Complete delivery of pipe racks for METROSTAV on site NEXEN Česká republika
- Complete delivery of steel structures for entrance gate
- Structural design of pipe conveyor for final customer in France
- Complete delivery of steel construction for reinforcement ceiling
Media
https://youtu.be/zM6WIZatzew
https://youtu.be/V2CgP7sr-ic
Image Gallery
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
- Title Title
View the embedded image gallery online at:
https://vhsc.cz/en/references/installation-of-steel-constructions/item/196-dodavka-ok?tmpl=component&print=1#sigProGalleriafeea2dfe7d
https://vhsc.cz/en/references/installation-of-steel-constructions/item/196-dodavka-ok?tmpl=component&print=1#sigProGalleriafeea2dfe7d
©2014 VH Steel and Construction s.r.o. Made by eifelstudio webdesign.